Answer:
the expected total amount of time in minutes is 88.4
Step-by-step explanation:
The computation of the expected total amount of time in minutes is given below:
= Standard deviation × needed to answer calls each day
= 1.7 × 52
= 88.4
hence, the expected total amount of time in minutes is 88.4
Answer:
26.69 square meters
Step-by-step explanation:
A=r(3.14)
A= 8.5(3.14)
A=26.69 meters
Answer:
1250000
Step-by-step explanation:
Let number of the total number of shoes sold be 'y'
y*(70/100)= 875000
70y = 875000*100
y = (875000*100)/70
y = 1250000
I got 4.14 because i multiplied the deviation which is 4.6 by 0.9 and got that answer