You can do this by drawing one line through parallel to PQS to meet RQ at T
Now calculate length of RT:-
cos 70 = RT / 70 giving RT = 23.94m
sin 70 = ST/70 giving ST = 65.78 m
draw a line from S perpendicular to PQ to meet PQ at U.
PU = 110 - 65.78 = 44.22 m
tan 50 = SU / 44.22 giving SU = 52.70 m
TQ = SU = 52.70 m
So x = TQ + RT = 52.70 + 23.94 = 76.6 m to 1 dec place.
Answer:
77,540
Step-by-step explanation:
Since 3 is less than 4, we round down a ten. This comes out to 77,540.
It is 3/4 of the pie is left because one slice is 1/4 of the pie and taking 1/4 from 4/4 is 3/4
Answer:
-1/2
Step-by-step explanation:
y2-y1/x2-x1
3-(-2)/ -3-7
5/-10
= -1/2
Answer:
It will take 3.214 minutes.
Step-by-step explanation:
<em>It is given that, the conveyor belt transports 300 cans in 5 mins and the smaller belt transports 300 cans in 9 minutes.</em>
Thus , the speed of conveyor belt is,
= 
and of smaller belt is,
= 
Thus, when both are used together,
<em>conveyor belt will transport (60)(t) cans and smaller belt will transport
(t) cans per minute.</em>
Thus the equation becomes,

t = 