Answer:
z=1.96
Step-by-step explanation:
Using normal distribution table or technology, 97.5% corresponds to z=1.959964, generally denoted z=1.96, or 1.96 standard deviations above the mean.
(above value obtained from R)
Actually, she worked for seven hours, so I'll solve for that.
7.20 x 3 = 21.6
6.75 x 4 = 27
21.6 + 27 = 48.6
48.6 /2 = 24.3
Her average should be $24.3 If she did work six hours, just multiply 6.75 x 3 and do what I did.
✌✌hfhdbejeoaksnebeueokendbdjdodklwpwpwpwpwoenrekpdpdpeiwnenrofpforjneel
Answer:
11.8 meter below
Step-by-step explanation:
No solution not sure if I’m right