Call me delusional, but I can't shake the weird hunch that there's supposed to be
a drawing to go along with this question, showing the values of the resistors and
exactly how they're connected to the battery.
In a series circuit, the voltage divides across the resistors in proportion to
their resistances. If two resistors in series are the only things connected to
your battery, then the voltage across each resistor is . . .
(12 volts) x (the resistance of that one resistor) / (the sum of both resistors) .
Answer:
The value is 
Explanation:
From the question we are told that
The speed is 
The radius of the earth is 
Generally the circumfernce of the earth is mathematically evaluated as

=> 
=> 
Generally the time taken is mathematically represented as


Converting to days

=> 
The mine involves digging tunnels and shafts deep underground is the underground mining.
<h3>What is mining?</h3>
Mining is the digging of the Earth deep down in search of some precious elements or resources found on Earth.
Underground mining is the digging down into the earth in order to create tunnels. The shafts need to be inserted into those tunnels so that it reaches the deposits of resources.
Thus, underground mining involves digging tunnels and shafts deep underground.
Learn more about mining.
brainly.com/question/14277327
#SPJ4
Answer:
Dance studio
Explanation:
Martial art use to defend ourself from any dangerous. Dance is a way to learn it
Answer:
Option D.
Value cannot be calculated without knowing the speed of the train
Explanation:
The speed of the beam can only be calculated accurately when the speed of the train is put into consideration. Based of the theory of relativity, the observer is on the ground, and the train is moving with the beam of light inside it. This causes a variation in the reference frames when making judgements of the speed of the beam. The speed of the beam will be more accurate if the observer is moving at the same sped of the train, or the train is stationary.
To get the correct answer, we have to subtract the speed of the train from the speed calculated.