Answer:
189.15cy
Explanation:
To understand this problem we need to understand as well the form.
It is clear that there is four wall, two short and two long.
The two long are 
The two long are 
The two shors are 
The height and the thickness are 14ft and 0.83ft respectively.
So we only calculate the Quantity of concrete,
![Q_c = [(2*122.08)+(2*86-375)]*14*0.833\\Q_c=4864.02ft^3](https://tex.z-dn.net/?f=Q_c%20%3D%20%5B%282%2A122.08%29%2B%282%2A86-375%29%5D%2A14%2A0.833%5C%5CQ_c%3D4864.02ft%5E3)
That in cubic yards is equal to 
Hence, we need order 5% plus that represent with the quantity

Answer:
23.3808 kW
20.7088 kW
Explanation:
ρ = Density of oil = 800 kg/m³
P₁ = Initial Pressure = 0.6 bar
P₂ = Final Pressure = 1.4 bar
Q = Volumetric flow rate = 0.2 m³/s
A₁ = Area of inlet = 0.06 m²
A₂ = Area of outlet = 0.03 m²
Velocity through inlet = V₁ = Q/A₁ = 0.2/0.06 = 3.33 m/s
Velocity through outlet = V₂ = Q/A₂ = 0.2/0.03 = 6.67 m/s
Height between inlet and outlet = z₂ - z₁ = 3m
Temperature to remains constant and neglecting any heat transfer we use Bernoulli's equation

Work done by pump

∴ Power input to the pump 23.3808 kW
Now neglecting kinetic energy

Work done by pump

∴ Power input to the pump 20.7088 kW
Answer:
Tech A
Explanation:
The amount of energy required to apply the same force with a 1:1 ratio is divided into 4, so you can apply 4 times as much force than a 1:1 ratio. efficiency and speed come into play here, but assuming the machine powering the gear can run at a unlimited RPM, 4:1 will have more force and a slower output speed than a 2:1 ratio.
Answer:
, 
Explanation:
The drag force is equal to:

Where
is the drag coefficient and
is the frontal area, respectively. The work loss due to drag forces is:

The reduction on amount of fuel is associated with the reduction in work loss:

Where
and
are the original and the reduced frontal areas, respectively.

The change is work loss in a year is:
![\Delta W = (0.3)\cdot \left(\frac{1}{2}\right)\cdot (1.20\,\frac{kg}{m^{3}})\cdot (27.778\,\frac{m}{s})^{2}\cdot [(1.85\,m)\cdot (1.75\,m) - (1.50\,m)\cdot (1.75\,m)]\cdot (25\times 10^{6}\,m)](https://tex.z-dn.net/?f=%5CDelta%20W%20%3D%20%280.3%29%5Ccdot%20%5Cleft%28%5Cfrac%7B1%7D%7B2%7D%5Cright%29%5Ccdot%20%281.20%5C%2C%5Cfrac%7Bkg%7D%7Bm%5E%7B3%7D%7D%29%5Ccdot%20%2827.778%5C%2C%5Cfrac%7Bm%7D%7Bs%7D%29%5E%7B2%7D%5Ccdot%20%5B%281.85%5C%2Cm%29%5Ccdot%20%281.75%5C%2Cm%29%20-%20%281.50%5C%2Cm%29%5Ccdot%20%281.75%5C%2Cm%29%5D%5Ccdot%20%2825%5Ctimes%2010%5E%7B6%7D%5C%2Cm%29)


The change in chemical energy from gasoline is:



The changes in gasoline consumption is:





Lastly, the money saved is: