Given that,
Mass of the stone, m = 400 g = 0.4 kg
Initial speed, u = 20 m/s
It is climbed to a height of 12 m.
To find,
The work done by the resistance force.
Solution,
Let v is the final speed. It can be calculated by using the conservation of energy.

Work done is equal to the change in kinetic energy. It can be given as follows :

So, the required work done is 32.99 J.
Answer:
Jupiter
Explanation:
Since the mass of Jupiter is the greatest from the given choices, it will exert the most force on any object orbiting 100km above its surface.
This is compliance with the Newton's law of universal gravitation which states that "the force of attraction between two bodies is directly proportional to the magnitude of their masses and inversely proportional to the distances between them".
- Therefore, the more the masses of two bodies, the higher the gravitational attraction
- Since the distance is the same, the planet with the greater mass will exert the most force on the satellite.
Answer:
Resistivity, electrical resistance of a conductor of unit cross-sectional area and unit length.
Explanation:
A characteristic property of each material, resistivity is useful in comparing various materials on the basis of their ability to conduct electric currents. High resistivity designates poor conductors.
Gravitational potential energy=mass of object x gravitational field strength on earth(9.8 usually rounded to 10) x the height the object is held at
Therefore if two objects were held at the same height, the object with more mass(the heavier object) will fall faster because it's gravitational potential energy is greater than that of the lighter object
5.5 is the answer i think