7. You are finding the area of the box. Not the cube, just a surface. Length times width of the surface. Eliminate other numbers and multiply
24.5×19.5
then
26×24.5
8. You are doing the same thing almost. Word problems are scary, but look for the numbers.
4inch ×8inch × 12inch
Find the volume
Multiply the volume by 3, that'd one answer
Devide the ORIGINAL volume by 2. don't divide the volume you multiplied by 3.
Answer: $110
Explanation: 110 x .1 = 11
110 - 11 = 99
9514 1404 393
Answer:
54.8 km
Step-by-step explanation:
The sketch and the applicable trig laws cannot be completed until we understand what the question is.
<u>Given</u>:
two boats travel for 3 hours at constant speeds of 22 and 29 km/h from a common point, their straight-line paths separated by an angle of 39°
<u>Find</u>:
the distance between the boats after 3 hours, to the nearest 10th km
<u>Solution</u>:
A diagram of the scenario is attached. The number next to each line is the distance it represents in km.
The distance (c) from B1 to B2 can be found using the law of cosines. We can use the formula ...
c² = a² +b² -2ab·cos(C)
where 'a' and 'b' are the distances from the dock to boat 1 and boat 2, respectively, and C is the angle between their paths as measured at the dock.
The distance of each boat from the dock is its speed in km/h multiplied by the travel time, 3 h.
c² = 66² +87² -2·66·87·cos(39°) ≈ 3000.2558
c ≈ √3000.2558 ≈ 54.77
The boats are about 54.8 km apart after 3 hours.
Let us take the case of United Building Company First
Rate per square foot = $15.75
Conference fee taken per hour = $45.99
Total conferencing hours = 4 hours and 15 minutes
= 4.15 hours
Total square feet of the house = 12226 square feet
Then
The total cost taken by the company = (15.75 * 12226) + ( 45.99 * 4.15) dollars
= 192559.5 + 190.86 dollars
= 192750.36 dollars
So the total amount taken by United Building Company is $192750.36 dollars
Now let us take the case of American Contracting Company
Rate per square foot taken = $12.46
Flat conferencing fee taken = $230
Then
The total cost taken by the company = (12.46 * 12226) + 230
= 152335.96 + 230 dollars
= 152565.96 dollars
So the total cost taken by the American Contracting Company is $152565.96.