Answer:
Incident Type 5
Explanation:
Incident type 5 is the type of incident that can be managed with one(1) or two(2) single resources with up to six personnel.
Command and General Staff positions (other than the Incident Commander) are not
initiated.
The incident is included within the early operational moment and frequently within an hour to
a limited hours after resources arrive on scene.
A good examples is a vehicle fire, an injured person, or a police traffic stop etc.
I Think it is Option 2 but i am not positive
The price will fall, because a fall in demand causes a fall in the price.
The correct answer is; Shoring equipment must be inspected before, during and after the erection of all formwork.
Further Explanation:
Since there is no choices that can be used to determine the best answer, I will state when shoring is appropriate. Shoring is done when digging on numerous job-sites and building houses, businesses, etc. When the company receives the shoring equipment, it needs to be inspected immediately before use.
During the project, all of the equipment should be inspected once again to make sure that the equipment is in working condition. OSHA does not give clear guidelines on the inspection process so many companies have their own. Some of the things that are inspected on the shoring equipment are;
- checking for leaking fluids in the cylinders
- checking to be sure the shore has been pressurized and sustains a pressure of 750 psi to 1500 psi.
- pressure can be held for approximately 60 seconds
Learn more about shoring equipment at brainly.com/question/5428790
#LearnwithBrainly