C. (2/5)^2 * n^9*2
4/25n^18
Answer:
14
Step-by-step explanation:
I did 35 divided by 5 which is 7. Since it is seven centimeters per night I did 98 divided by 7 which is 14.
To find the variance, you must square the standard deviation, or <span>σ.
</span>
<span>σ = 23.9
The variance is
</span>
<span>σ²= 23.9² = 571.21
</span>
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates