Answer:
Total work done in expansion will be 
Explanation:
We have given pressure P = 2.10 atm
We know that 1 atm 
So 2.10 atm 
Volume is increases from 3370 liter to 5.40 liter
So initial volume 
And final volume 
So change in volume 
For isobaric process work done is equal to 
So total work done in expansion will be 
Answer: v = 2.24 m/s
Explanation: The <u>Law</u> <u>of</u> <u>Conservation</u> <u>of</u> <u>Energy</u> states that total energy is constant in any process and, it cannot be created nor destroyed, only transformed.
So, in the toy launcher, the energy of the compressed spring, called <u>Elastic</u> <u>Potential</u> <u>Energy (PE)</u>, transforms into the movement of the plastic sphere, called <u>Kinetic</u> <u>Energy (KE)</u>. Since total energy must be constant:

where the terms with subscript i are related to the initial of the process and the terms with subscript f relates to the final process.
The equation is calculated as:






v = 2.24
The maximum speed the plastic sphere will be launched is 2.24 m/s.
Distance = speed x time
distance = 116 x 10
distance = 1160 m
The average velocity of Sandy is given by the total distance covered S divided by the total time taken t:

The total distance covered is

while the total time taken is 2 hours + half an hour (for the rest) + 1 hour and half, so

Therefore, the average velocity is
So, <u>the value of the work is approximately 84.65 J</u>.
<h2>Introduction</h2>
Hi ! Here I will help you to discuss the subject about work that caused by force in amount value of angle. Work is affected by the force and displacement.
- If related to the magnitude of the force, the amount of work will be proportional to the magnitude of the applied force. Thats mean, if the value of the force that applied on it is greater, then the value of the work will be greater.
- If related to the magnitude of shift, the amount of work will be proportional to the magnitude of shift of object. Thats mean, if the value of the shift on it is greater, then the value of the work will be greater.
<h3>Formula Used</h3>
The work done by a moving object can be expressed in the equation:
If the Angle Is Ignored

If the Angle Effect on Work

With the following condition:
- W = work that done by object (J)
- F = force that applied (N)
- s = shift or distance (m)
= angle of elevation (°)
<h3>Solution</h3>
We know that :
- F = force that applied =
N - s = shift or distance = 84.9 m
= angle of elevation = 45°
What was asked ?
- W = work that done by object = ... J
Step by step :






<h3>Conclusion</h3>
So, the value of the work is approximately 84.65 J.