I belive the answer is the 3rd one
Answer:
Contract A is cheaper because $115 per month is less than $148 per month
Step-by-step explanation:
To find the unit price we divide the total cost given by the total months given for each contract to find out the cost per month.
$2070/18 months = $115 per month
$1776/12 months = $148 per month
Contract A is cheaper because $115 per month is less than $148 per month
<span>y = tan^−1(x2/4)</span>
tan(y) = x2/4
sec2(y) = x/2
y′ = xcos^2(y)/2
<span>cos^2(y) = <span>16x2+16</span></span>
<span>y′ = <span>8x/(<span>x2+16)
let u be x2+16
du is 2x dx
dy = 4 du / u
y = 4 ln (</span></span></span>x2 <span>+ 16)
y at x =0 = </span> 4 ln (<span>16) = 11.09</span>
Answer:
12m
Step-by-step explanation
If the height of the ball after x seconds be modelled by the equation
h(x)=−(x−2)² +16
The height of the ball at the time it is thrown will be the height at the initial time. At that point that it is initially thrown the time is 0seconds i.e x = 0
To get the height at t x = 0seconds, we will substitute x = 0 into the modeled function to have;
h(0) = -(-0-2)²+16.
h(0) = -(-2)²+16
h(0) = -4+16
h(0) = 12
The height of the ball at the time the ball is thrown is 12m