1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
gladu [14]
3 years ago
15

What is 5ED4 − 07A4 when these values represent signed 16- bit hexadecimal numbers stored in sign-magnitude format? The result s

hould be written in hexadecimal. Show your work.
Engineering
2 answers:
8_murik_8 [283]3 years ago
8 0

Answer:

5730

Explanation:

Binary notations for 5ED4: 5 = 0101; E = 1110; D = 1101; 4 = 0100

Also, for 07A4: 0 = 0000; 7 = 0111; A = 1010; 4 = 0100

5ED4 - 07A4 = 0101 1110 1101 0100 - 0000 0111 1010 0100

= 0101 0111 0011 0000

∴ Hexadecimal representation = 5730

butalik [34]3 years ago
6 0

Answer: 5730

Explanation:

5ED4 -07A4 = 5730

0101 1110. 1101 0100 (5ED4)

0000 0111 1010. 0100 (07A4)

0101 0111 0011. 0000

5 7 3 0

You might be interested in
What is an example of a traditional career?
vladimir2022 [97]

Answer:

C, Teacher

Explanation:

7 0
3 years ago
Read 2 more answers
1. The construction process begins with which of the following stages?
Firdavs [7]

Answer:

c) site preparation

Explanation:

A construction process can be defined as a series of important physical events (processes) that must be accomplished during the execution of a construction project.

Generally, in the construction of any physical asset such as offices, hospitals, schools, stadiums etc, the first step of the construction process is site preparation. Site preparation refers to processes such as clearing, blasting, levelling, landfilling, surveying, cutting, excavating and demolition of all unwanted objects on a piece of land, so as to make it ready for use.

This ultimately implies that, site preparation should be the first task to be accomplished in the construction process.

Hence, the construction process typically begins with site preparation before other activities such as the laying of foundation can be done.

Additionally, construction costs can be defined as the overall costs associated with the development of a built asset, project or property. The construction costs is classified into two (2) main categories and these are; capital and operational costs.

7 0
3 years ago
we wish to send at a rate of 10Mbits/s over a passband channel. Assuming that an excess bandwidth of 50% is used, how much bandw
gayaneshka [121]

Answer:

QPSK: 7.5 MHz

64-QAM:2.5 MHz

64-Walsh-Hadamard: 160 MHz

Explanation:

See attached picture.

6 0
3 years ago
Which of the following are some of the problems found in city streets?
storchak [24]

Answer: drugs and rushing cars

Explanation: drug dealers are everywhere on city streets nowadays they have been killing young adults

rushing cars or reckless drivers cut curb fast and potentially someone can get hurt they are speeding and not worrying about other people lives at stake

4 0
3 years ago
A right triangle has a height of 20 centimeters and a base of 10 centimeters. What is the área of the triangle
zmey [24]

Answer:

100 cm

Explanation:

...........................

6 0
3 years ago
Other questions:
  • A rigid tank of 1 in3 contains nitrogen gas at 600 kPa, 400 K. By mistake someone lets 0.5 kg flow out. If the final temperature
    5·1 answer
  • Which term defines the amount of mechanical work an engine can do per unit of heat energy it uses?
    5·1 answer
  • What is the Principle of Entropy Increase?
    9·1 answer
  • Which of the following drivers has the right-of-way?
    9·1 answer
  • Is there a way to get the answers to a NCCER book test?
    7·1 answer
  • What could happen in the aviation
    5·1 answer
  • Introduction for site visit​
    13·1 answer
  • A 280 km long pipeline connects two pumping stations. It is desired to pump 0.56 m3/s of oil through a 0.62 m diameter line, the
    14·1 answer
  • If a tapered roller bearing is adjusted to loose, the bearing will bind and overheat.
    11·1 answer
  • Which option distinguishes why the behaviors of the team in the following scenario are so important during the engineering desig
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!