Answer:
So to maximize profit 24 downhill and 20 cross country shouldbe produced
Step-by-step explanation:
Let X be the number of downhill skis and Y the number of cross country skis.
Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours
Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.
Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90
total finishing time taken = 0.5x+1.5 y≤42
Profit function
Z = 50x+50y
Objective is to maximize Z
Solving the two equations we get intersecting point is
(x,y) = (24,20)
In the feasible region corner points are (0.28) (36,0)
Profit for these points are
i) 2200 for (24,20)
ii) 1400 for (0,28)
iii) 1800 for (36,0)
So to maximize profit 24 downhill and 20 cross country shouldbe produced.
Answer:
0
Step-by-step explanation:
After the decimal point is the tenths place, and after the tenths place is the hundredths place.
After the decimal point is the number 0, which is at the tenths place. After the tenths place is 6, which is at the hundredths place.
2x-4y=-16
ax+4y=6 +
--------------------
2x+ax=-10; for x=-2,
2(-2)+a(-2)=-10
-2a=-10+4
a=-6/-2
a=3
To answer this question, use permutation since the order of the letter matters. There are 7 letters and only 4 are to be used for the code. This is a permutation of 7 taken 4 (7P4) which is equal to 840. Thus, the sample space is 840.
For the next questions, there are 3 vowels for as the first letter, only 6 letters are available for the second, 5 on the next, and 4 on the last. Multiplying these numbers give 360. To solve for probability, divide this number with the sample space. Thus, the answer is 3/7.
X² + 4x + 4
x 2
x 2
(x + 2) (x + 2)
x + 2 should be your answer
binomial is having 2 terms
hope this helps