Bike Frame Flow Time
The value-added percentage of the flow time for this bike frame is:
= 46.
Explanation:
a) Data and Calculations:
Bike Frame Flow Time:
Setup time = 7 hours
Processing time = 6 hours
Storage time = 7 hours
Flow time of the bike frame = 13 hours (7 + 6)
Value-added percentage of the flow time for this bike frame = 6/13 * 100
= 46%
b) Flow time represents the amount of time a bicycle frame spends in the manufacturing process from setup to end. It is called the total processing time. Unless there is one path through the process, the flow time equals the length of the longest process path. The storage time is not included in the flow time since it is not a manufacturing process.
Answer:
d. The system of water spray pipes did not have sufficient water supply
Explanation:
The Union Carbide India Ltd. was chemical factory situated at Bhopal that produces various pesticides, batteries, plastics, welding equipment, etc. The plant in Bhopal produces pesticides. In the year 1984, on the night of 2nd December, a devastating disaster occurred on the Bhopal plant which killed millions of people due to the leakage of the poisonous, methyl isocyanate. This disaster is known as Bhopal Gas tragedy.
Soon after the gas pipe exploded, the fire brigade started spraying water into the air to
the cloud of the gases in the air but there was not sufficient amount of water in the water sprays and so it was not effective.
Thus the correct answer is option (d).
Answer:
The answer to this question is given below in the explanation section
Explanation:
The correct answer is RAM.
RAM is used for storing programs and data currently being processed by the CPU. So, the data in the RAM, can be easily accessible and processed by the CPU more fastly.
While Mass memory and neo volatile memory is not correct options. because these types of memory can stores a large amount of data but CPU fetch data from these memories into RAM. and, RAM can only be used by the CPU when performing operations.