engineering approach their work by finding new solutions to their problems. like if two things dont go together in an invention, they will find another way
Answer:
26.7 min
Explanation:
First, we will find the <u>time required to drill each hole</u>:
- N = 300 x 12/0.75
= 1527.7 rev/min
- fr = 1527.7 (0.015) = 22.916 in/min
Formula for <u>distance per hole</u>: 0.5 + A + 1.75
- A = 0.5 (0.75) tan (90-100 / 2) = 0.315 in
- Tm = (0.5 + 0.315 + 1.75) / 22.916 = 0.112 min
Now, we will calculate the <u>time required to draw back the drill form hole</u>:
= 0.112 / 2 = 0.056 min
Time to move between holes = 1.5 / 15 = 0.1 min
For 100 holes, the number of moves between holes = 99
Total time required to drill 100 holes (t):
t = 100 (0.112 + 0.056) + 99 (0.1) = 26.7 min
Answer: Its materials are good reactors with electrical terminals and most times we go the easy way
Explanation:
Answer: c. The creative middle way
Explanation:
As there is both an obligation to preserve jobs and to protect the environment, a creative middle way which involves compromise would be most effective.
The company involved should process and remove the worst pollutants alone while leaving others so that the process will not be so expensive that they have to close down.
They will do this till a better and more environmentally beneficial solution can be found at which point they can then clean up the previous pollutants with the hope that they have not irrecoverably damaged the environment.