1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
masya89 [10]
3 years ago
5

a line with the slope of -2 passes through the point (1,7) what is the closest point on the line above (1,7) which has a whole n

umber coordinates?
Mathematics
1 answer:
deff fn [24]3 years ago
3 0
The closest point above on this line is (0,9)

You can find this by using the rise over run method. Since the slope is -2, we can move to the next whole number point by observing the fraction 2/-1.

Rise = 2
Run = -1

If you start on the point (1,7) and rise two, it will bring you to (1,9), then you have to move back one space (or run) to (0,9).
You might be interested in
What 2 shapes did you use to find the area of the figure above? What is the area of each separate figure and the total of the en
algol [13]

Answer:

sorry

Step-by-step explanation:

7 0
3 years ago
Read 2 more answers
What is the percent change of 6 <br> to 36
Kaylis [27]
There is a 483% Change
4 0
3 years ago
Determine the answer to 3 + -5 and explain the steps using a number line
Marizza181 [45]
Adding a positive to a negative, you would look at the number with the greater absolute value, and that number would determine the sign of the sum. 

5 - 3 = 2

Since 5 is bigger, you use that sign

-5 

-2

Answer: -2
6 0
3 years ago
Read 2 more answers
Please help!<br> What is the formula for simplest interest?
natima [27]

Answer:

A= P(1+rt)

Step-by-step explanation:

8 0
2 years ago
Read 2 more answers
Sofia can type the work in 10 hours. Nova can do it in 15 hours. They work together for 4 hours, then Sofia and Nova finish the
AlladinOne [14]

Answer:

2 days.

Step-by-step explanation:

Let, Sofia can type the x amount of work in 10 hours.

So, in one hour Sofia can type \frac{x}{10} amount of work.

Again, Nova can type x amount of work in 15 hours.

So, in one hour Nova can type \frac{x}{15} amount of work.

Hence, if they work together, they can type \frac{x}{10} + \frac{x}{15} = \frac{6x + 4x}{60} = \frac{10x}{60} = \frac{x}{6} amount of work in one hour.

Therefore, working together they can type the x amount of work in \frac{x}{\frac{x}{6} } = 6 days.

So, they have to work for (6 - 4) = 2 days more to finish the work. (Answer)

6 0
3 years ago
Read 2 more answers
Other questions:
  • What coordinate for F would make triangle ABC and triangle DEF congruent? (The file of the image is attached!)
    5·2 answers
  • For numbers 10a-10b use place value to find the product 3x600=3×_hundreds
    10·1 answer
  • How many sig figs r there in 0.01724
    15·1 answer
  • X – y = 3 (line a)
    15·1 answer
  • Division problems to solve for 4th grade
    8·1 answer
  • a plumber has a very long piece of pipe is used to run the water parallel to a major place the pipe is cut into two sections 1 s
    15·1 answer
  • Which system of linear inequalities is represented by
    5·1 answer
  • Alvin is 7 years younger than Elgas. The sum of their ages is 63. What is Elgas age?
    15·1 answer
  • What is the equation of a line passing through the point (1,2) and parallel to the line y=3x+2?
    12·2 answers
  • I need 954x66.76 plz 5min til due
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!