1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
torisob [31]
3 years ago
13

Math problem, please help:)

Mathematics
1 answer:
alukav5142 [94]3 years ago
5 0
3_/—- 5 i’m pretty sure
You might be interested in
Find the distance 3/4 from -6 to 8.
Olegator [25]

\frac{3}{4}\\ is 0.75 so it should be between 0 and 1 but a little bit closer to 1.

7 0
4 years ago
Read 2 more answers
Please help. 1. The population of a town was 500 in 2010. The population grows at a rate of 9.6% annually. (a) Use the exponenti
pogonyaev

Answer:

Ok I did the math. t= 1248.

Step-by-step explanation:

Multiplying 500 by 9,6% is the start. Then, multiply ever number after that. Ex. 500 x 9.6%=548.  Then multiply 548 by 9.6% and so on. Hope this helps!!

3 0
3 years ago
Jocelyn needs to place a 7 meter ladder against a house so that the base of the ladder is 6.5 meters from the building. I want a
GrogVix [38]

Answer:

21.787°

Step-by-step explanation:

4 0
4 years ago
A team of three students are working on a language-learning app; they need to develop 300 micro-lessons and 300 micro-tests befo
Olegator [25]

Answer: a) 15 b)

Step-by-step explanation:

Let X be the number of days:

a)

For LESSONS:

Jordan does 10 / day ( 10*X)

Marco 5 / day ( 5*X)

Junyi 5 / day ( 5*X)

For TESTS:

Jordan does 5 / day ( 5*X)

Marco 10 / day ( 10*X)

Junyi 8 / day ( 8*X)

for each they need a total of 300

a) 10X+5X+5X=300 => 20X = 300 => X = 15 days for the lessons

b) 5X+10X+8X = 300 => 23X = 300 => X = 13.04 days for the tests

so they need 15 days to finish both tasks

now if Junyi gets sick we just eliminate his contribution

a) 10X+5X=300 => 15X = 300 => X = 20 days for the lessons

b) 5X+10X = 300 => 15X = 300 => X = 20 days for the tests

so in 20 days they will finish without him

If jordan works 10 hours a day, we just replace him with 10/24

a) 10(10/24)+5X+5X= 300 => X = 29.58 days for the lessons

b) 5(10/24)+10X+8X = 300 => X = 16.51 days for the tests

so at the end to complete both tasks they need 29.58 days

4 0
3 years ago
3/4=3/8x-3/2 what is the answer for this?
Nonamiya [84]
The answer is x=6 ;)
3 0
3 years ago
Other questions:
  • At 1 p.m., Lin records an outside temperature of –14.8°F. At 3 p.m., she records the outside temperature and notices the tempera
    10·1 answer
  • A company owns two stores and recorded data for the number of days missed by employees. Store 1 1, 2, 1, 1, 0, 4, 2, 0, 0 Store
    13·1 answer
  • If 2x = 5, 3y = 4, and 4z = 3, what is the value of 24xyz ?
    10·1 answer
  • Given f(x) = x2 + 6x and g(x) = 2x3, which of the following are true? Check all correct answer(s).
    6·1 answer
  • . The closest star to our Sun, Proxima Centauri, is 39,900,000,000,000,000
    5·1 answer
  • How many liters of 30% alcohol solution must be mixed with 40 liters of a 70% solution to get a 40% solution?
    10·1 answer
  • Consider circle C with angle ACB measuring StartFraction 3 pi Over 4 EndFraction radians.
    7·2 answers
  • A. volume<br> B. perimeter<br> C. area
    6·1 answer
  • A bag of kibble and 4 cans of cat food cost $8.40. The kibble
    9·1 answer
  • Mina traveled 375 miles in 5 hours. How many miles did Mina travel per hour?
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!