1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
ryzh [129]
3 years ago
11

R + (-5r) Please explain how it's done.

Mathematics
1 answer:
Lisa [10]3 years ago
7 0

Answer:

-4r

Step-by-step explanation:

r + (-5r)

1r + (-5r)

Factor out an r

r( 1 -5)

One minus 5 is negative 4.   If you have one dollar and you borrow five dollars,  how much did you borrow?  4  but that 4 is borrowed so it is negative


r (-4)

-4r



You might be interested in
50 Points What is the value of r? 6.4r−5.9r=−3.25 Question 1 options: A -6.5 B 6.5 C -3
Oliga [24]

Answer:

Option A. -6.5

Step-by-step explanation:

we have

6.4r-5.9r=-3.25

Solve for r

That means ---> isolate the variable r

Combine like terns left side of the equation

0.5r=-3.25

Divide by 0.5 both sides

0.5r/0.5=-3.25/0.5

r=-6.5

4 0
3 years ago
When a number x is multiplied by 6, the result is 38 .
serg [7]
X = 19/3

________
________
6 0
4 years ago
The Versatech Corporation has decided to produce three new products. Five branch plants now have excess production capacity. The
RSB [31]

Answer: provided in the explanation segment

Step-by-step explanation:

here i will give a step by step analysis of the question;

A: Optimization Formulation

given Xij = X no. of units of product i manufactured in Plant j, where i = 1,2,3 and J = 1,2,3,4,5

Objective function: Minimize manufacturing cost (Z)

Z = 31 X11 + 29 X12 + 32X13 + 28X14 + 29 X15 + 45 X21 + 41 X22 + 46X23 + 42X24 + 43 X25 + 38 X31 + 35 X32 + 40X33

s.t

X11 + X12 + X13 + X14 + X15 = 600

X21 + X22 + X23 + X24 + X25 = 1000

X31 + X32 + X33 = 800

X11 + X21 + X31 <= 400

X12 + X22 + X32 <= 600

X13 + X23 + X33 <= 400

X14 + X24 ​​​​​​ <= 600

X15 + X25 <= 1000

Xij >= 0 for all i,j

B:

Yes, we can formulate this problem as a transportation problem because in transportation problem we need to match the supply of source to demand of destination. Here we can assume that the supply of source is nothing but the manufacturing capability of plant and demand of destination is similar to the demand of products.

cheers i hope this helps!!

3 0
3 years ago
Becky and Don live 210 miles apart and plan to visit each other for a week. They decide to leave at the same time, drive toward
Anestetic [448]

If they don't stop 1 hour and a half.

90 miles away from Becky and 120 away from Don

4 0
3 years ago
Read 2 more answers
A man is filling an empty 5-gallon bucket with water at a constant rate. there are 2.4 gallons of water in the bucket after fill
r-ruslan [8.4K]

Answer: The answer is 0.2

Step-by-step explanation: 2.4g / 12 minutes

0.2g/minutes

5 0
3 years ago
Other questions:
  • Say 135,791,357.91 in words
    9·2 answers
  • Angelique says that finding the absolute value of a number is the same as finding the opposite of the number. For example |-5|=5
    13·2 answers
  • I need help please i will give brainliest
    5·2 answers
  • What value of x makes the equation true? 4x - 3= -9 + 7x <br> 2<br> -2<br> −12<br> 12
    8·1 answer
  • Find the value of the expression 4*2-6+8*3+4
    12·1 answer
  • I need help do 7-10 please ASAP
    14·1 answer
  • Assume that the significance level is a=0.05. Use the given information to find the P-value and the critical value(s). The test
    14·1 answer
  • Graph the inequality y is greater than or equal to -2x - 2
    10·1 answer
  • In five minutes 25 cars, 8 trucks, 12 vans and 2 motorcycles drove past the house. Which
    15·1 answer
  • How to find the derivative of an integral with bounds.
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!