1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Paha777 [63]
3 years ago
13

Explica el conflicto entre fray Nicolás de Ovando y Diego Colón. Toma en consideración los acuerdos de las Capitulaciones de San

ta Fe. También debes incluir en tu respuestas a Juan Cerón y a Miguel Díaz.
Social Studies
1 answer:
Lena [83]3 years ago
5 0

Answer:

Explica el conflicto entre Fray Nicolás de Ovando y Diego Colón. Toma en consideración los acuerdos de las Capitulaciones de Santa Fe. También debes - 21728949. ... en consideración los acuerdos de las Capitulaciones de Santa Fe. También debes incluir en tu respuesta a Juan Cerón y a Miguel Díaz.

Explanation:

You might be interested in
Need for tomorrow exam !
loris [4]

Answer:

genesis

Explanation:

because it is

3 0
3 years ago
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
________ wrote that the Romans cultivated twenty-three different varieties of apple.
Deffense [45]

Answer:

johnny Appleseed

Explanation:

Johnny Appleseed also known as

John Chapman who was American pioneer nurseryman arround 1800's. He introduced apple trees to different regions such as Illinois, some part of parts of Pennsylvania as well as Indiana and West Virginia.Johnny Appleseed was in year 1774 in born in Leominster, Massachusetts. His dream is that he doesn't want anyone to go with hunger, he produced as many apples as he could. It should be noted that johnny Appleseed wrote that the Romans cultivated twenty-three different varieties of apple.

8 0
3 years ago
Which statement best paraphrases this text? Law enforcement often struggles to stop the number of illegal crossings. The governm
quester [9]

The statement that best paraphrases this text is:  The government has already placed as many additional resources as possible at the border.

A paraphrase is a summary of the original text. A summary should mirror the thoughts of the writer.

In the first sentence of this excerpt, the President said that progress has been made on the border and additional resources will be supplied to ensure that the border is monitored.

So, we can summarize the text by saying that the government has already placed as many additional resources as possible at the border.

This is the text:

First, we’ll build on our progress at the border with additional resources for our law enforcement personnel so that they can stem the flow of illegal crossings, and speed the return of those who do cross over. –Address to the nation on immigration, President Obama, 2014

Learn more about summary here:

brainly.com/question/24435726

6 0
2 years ago
Looking at the modern day statistics do you think it was wise of the framers of the constitution to have two legislative bodies
Lesechka [4]

If there was only one house of representatives the smaller states will have less representation.

Explanation:

The original model of the house of representatives was taken from Britain. There are two senators per state and then there is the house of representatives where the number of members depends on the population of the state.

If the senate is removed, there will be less representation for the smaller states and thus there will be a chance they can be cornered.

The issue with this, is that constitutionally, all states are to be equal in the eyes of  the federal government in the Federation.

5 0
3 years ago
Other questions:
  • HURRY PLZZZZZZZZZZZZ A car stopped at the top of a ramp has __. Question 1 options: kinetic energy. mechanical energy. potential
    5·2 answers
  • Academic tracking refers to:
    11·1 answer
  • What was the name of the disease that killed nearly half the people of Europe? * 1.The Black Death 2.Influenza 3. Small Pox 4. M
    8·1 answer
  • How will the economy recover after coronavirus
    10·1 answer
  • _____ may suspend a writ of habeas corpus in a time of war.
    13·2 answers
  • Pablo Honey please come to florida, does anyone know what this is from?
    8·1 answer
  • Juan's psychology professor is discussing color processing. The professor shows a solid green square on the projector and asks s
    8·1 answer
  • scientists use models to help them study systems in nature, such as predicting the paths of hurricanes, demonstrating how cell o
    10·1 answer
  • PLEASE HEP<br> Write out a paragraph showing your understanding of scarcity
    10·1 answer
  • Use each of these words in a sentence.
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!