Answer:No Matt's calculation is not correct.
Step-by-step explanation:
We have to multiply by the number of the area.If it is 4 inches we multiply by 4
15 x 4 =60
A=4 inches squared
A=LxW (length x width )
so you can say that:
Matt is incorrect because He skipped the step of multiplying 2 by 2 in the formula which is where we get 4 from.
Answer:
3 days
Step-by-step explanation:
company A would have the equation 50x+40 =y and company B would be 30x + 100 =y. we're tying to find the days that these cost the same so you would do 50x+40 = 30+100. When you isolate x you get 3
Slope of -2, (1,5)
y = mx + b
slope(m) = -2
(1,5)...x = 1 and y = 5
now we sub and find b, the y int
5 = -2(1) + b
5 = -2 + b
5 + 2 = b
7 = b
so ur equation is : y = -2x + 7
The approximation method used to estimate a point between 2 given points is called linear interpolation. The approximation method used to estimate a point that does not lie between 2 given points is called linear extrapolation.A linear function has the form f(x) = mx + b. Its graph is a line that has slope m and y intercept at (0,b).
Answer: 2 hr.
Explanation: Think back to rate of change. <em>d</em> = <em>rt</em>, <em>r</em> = <em>d/t</em>, <em>t</em> = <em>d/r</em>. In this case, we will be using <em>d</em> = <em>rt</em>. Mph would be <em>r</em>, rate, so you would categorize 15 mph and 8 mph under rate. <em>t</em> should represent the time each cyclist traveled. Tracey's and Emma's distance, <em>d</em>, would be the same as their mph, hence Tracey's being 15<em>t</em> and Emma's would be 8<em>t</em>. When you add Tracey's distance plus Emma's distance, you end up with 46 mi. Now, you need to combine like terms, which should look like 15<em>t</em> + 8<em>t </em> = 46. Add 15 and 8 to get 23, so it should be 23<em>t</em> = 46 now. Then, divide both sides of the equation by 23 and now you should have your answer, <em>t</em> = 2 hr.