Answer:
W = 819152 J = 819.15 KJ
Explanation:
The work done by Juri can be given by the following formula:

where,
W = Work done = ?
F = Force = 200 N
d = distance = 5 km = 5000 m
θ = angle to horizontal = 35°
Therefore,
W = (200 N)(5000 m)Cos 35°
<u>W = 819152 J = 819.15 KJ</u>
Answer:
mercury
arsenic
ricin
ddt
Explanation:
pls mark me as brainliest
Answer:
Secant line is a straight line which joins the two points of functions and it also represents the slope between two points.
Explanation:
Secant line is also known as average rate of change of functions between two points and also called slope.
In mathematical form,
Secant line = average rate of change = slope
Slope m = y/x
Guessing you want the average speed. We can multiple each speed by the time we spent going that speed, and them all together and then divide by the total time we spent in traffic to get the average speed. We spent a total of 7.5 minutes in traffic, so average speed = (12*1.5+0*3.5+15*2.5)/7.5 = 7.4 m/s