Answer:
Minimum cycle time = time for longest task = 2.4 minutes
Maximum cycle time = sum of the times to complete all the tasks = 18 minutes
Step-by-step explanation:
For the minimum cycle time, the reasoning is that all the tasks can be done simultaneously, at some during the assembling task. Hence, minimum time to complete one cycle is the time it takes to complete task that takes the longest time to complete.
For the maximum cycle time, the reasoning here is that each task is done after the completion of the previous task. The total time taken to finish the task will then be the sum of the time taken to complete each task. This usually is at the beginning of operations.
The correct answer is D.
If you look at the equation you can see that the line crosses at the points
(1,5) and (-2, -4). Use this set of ordered pairs to find the slope.
(-4-5)/(-2-1) = (-9/-3) = 3
The use the point-slope formula and fill in the ordered pair (1,5) with the slope.
y - 5 = 3( x - 1)
Answer: 70 ft
Step-by-step explanation:
Given
height of book is measured by the function is

when the book is thrown 

The height of the book is 
Aplicando multiplicación cruzada, tiene-se que el valor de w es w = 9.
- Cuando una proporción es dada, con una igualdade de duas proporciones, puede-se aplicar multiplicación cruzada entre ellas.
En este problema, la ecuación que relaciona las proporciones es dada por:

Aplicando multiplicación cruzada:




El valor de w es w = 9.
Un problema similar es dado en brainly.com/question/24615636
Let r(cos O + i sin O) be a cube root of 125(cos 288 + i sin 288)
then
r^3(cos O + i sin O)^3 = 125(cos 288 + i sin 28)
so r^3 = 125 and cos 3O + i sin 3O = cos 288 + i sin 288
so r = 5 and 3O = 288 + 360p and O = 96 + 120p
so one cube root is 5 (cos 96 + i sin 96)
Im a little rusty at this stuff Its been a long time.
Im not sure of the other 2 roots
sorry cant help you any more