Tom--------------
>10 sq ft per minute
Tim-------------------
>3.5*10=35 sq ft per minute
Both painters (10+35)=45
sq ft per minute
let's assume a cubic unit crate----------> V1=1*1*1=1 feet3
<span>the total surface of the cube is S1=6*(1*1)=6 </span>sq
ft
if the volume of the cube increases twice
V2=2 feet3 ------------------- > 2=x*x*x------------- >x=2^(1/3)
And the S2=6*(2^(1/3)*<span> 2</span>^(1/3)=9.5244 sq ft
V2/V1=9.5244/6=1.5874
Therefore
If Tim and Tom-----------------------
> take 1 day----------- > to paint a crate V1
For the crate V2------------- > take 1.5874 days
assuming an 8-hour work day
0.5874*8=4.70 hr-------------- > 4 h 42 min
The answer is 1 day 4h 42 min
No association because the dots are just scattered all over the graph
Negative association would be when the dots are going toward downwards
Positive association would be when the dots are going toward upwards
Instead i use pemdas so the answer to this problem would be 48
Answer:
$49.55
Step-by-step explanation:
multiply 5.25 by 12 then subtract thetnumber by 13.45