If you increase the mass of an object and want to move an object a specific distance, then you need to do extra work than the earlier
<h3>What is work done?</h3>
The total amount of energy transferred when a force is applied to move an object through some distance
Work Done = Force * Displacement
For example, let us suppose a force of 10 N is used to displace an object by a displacement of 5 m then the work done on the object can be calculated by the above-mentioned formula
work done = 10 N ×5 m
=50 N m
Thus, when an object's mass is increased and it is desired to move it a certain distance, more work must be done than previously.
Learn more about work done from here
brainly.com/question/13662169
#SPJ1
Answer:
The kinetic energy of the ejected electrons increases.
Explanation:
As we know that electrons are only ejected from a metal surface if the frequency of the incident light increases the work function of the metal. If the frequency of the incident light is less than the work function of the metal no matter how intense the beam the electrons will not be ejected from the surface.
Using conservation of energy principle we have
If we increase the intensity of incident light the term on the LHS of the above equation increases this increase appears in the kinetic energy term in RHS of the equation since
remains constant.
46.6666 that is the mass number
Explanation:
14 divided 3.0
Sum of all forces = mass * acceleration
Ft= tension force
Fw= force of gravity (Fw= mass* acceleration of gravity which is 9.8 this only applies to force of gravity)
Ft- Fw = 0 (there is no acceleration)
Ft = Fw
Ft= m*g
Ft= 0.250kg*9.8m/s
Ft= 2.45N
Answer:
23.52 m/s
Explanation:
The following data were obtained from the question:
Time taken (t) to reach the maximum height = 2.4 s
Acceleration due to gravity (g) = 9.8 m/s²
Initial velocity (u) =..?
At the maximum height, the final velocity (v) is zero. Thus, we can obtain how fast the rock (i.e initial velocity)
was thrown as follow:
v = u – gt (since the rock is going against gravity)
0 = u – (9.8 × 2.4)
0 = u – 23.52
Collect like terms
0 + 23.52 = u
u = 23.52 m/s
Therefore, the rock was thrown at a velocity of 23.52 m/s.