Here is the answer for the question
Answer:
undefined
Step-by-step explanation:
The slope of a vertical line parallel to the y- axis is undefined.
Answer:
0.1463
Step-by-step explanation:
Number of observations = 10
Sample mean = 10.5
Sum of standard deviation = 264.5
X = 14
We are to calculate The leverage statistic for study hour 14 using the data above
= 1/10 + (14-10.5)²/264.5
= 1/10 + 3.5²/264.5
= 0.1 +12.25/264.5
= 0.1+0.04631
= 0.1463 is the leverage statistic for the study
Answer:
1. Her time in minutes is 720/s minutes
2. Given her time to be 20 minutes, her speed is 36 mph
Step-by-step explanation:
Mathematically,
Distance = speed * time
In this question, we want to calculate time;
So time = distance/speed
times = 12 miles/s mph = 12/s hours
Now we want our answer in minutes
Kindly recall that 60 minutes = 1 hour
So 12/s hours will be 12/s * 60 = 720/s minutes
2. Since she drives from home to the office in in 20 minutes, we want to calculate her speed in mph
From the time calculated above i.e 720/s
We can equate 20 = 720/s
20s = 720
s = 720/20
s = 36 mph
Since there is a shortage in the budget in 2005 by 553,656,965,393.18, the total debt that of the United States in 2005 will be the public debt by 2004 added with this deficit in the budget. Having said that, the public debt by 2004 should be equal to,
$ 7.9327 x 10^12