Answer:
All of the Above are true.
Step-by-step explanation:
All of the statements are true if you evaluate them properly. I don't really wanna explain each and every choice so just trust me on this one. I got 100% on the Bellwork
Answer:
D
Step-by-step explanation:
Let the total production order be X. The combined rate is thus x/36 orders per hour.
Now, we know that the three machines are working at the same constant rate. This means that individual rate for each of the machines will be x/36 divided by 3 and that gives x/108 per machine.
Now, we are having another machine coming at the same constant rate. This means we are adding an x/108 rate to the preexisting x/36.
The new total rate thus becomes x/108 + x/36 = 4x/108
Now we know that the total new rate is 4x/108. Since the total work doesn’t change and it is still x, the time taken to complete a work of x orders at a rate of 4x/108 order per hour would be x divided by 4x/108 and this is x * 108/4x = 108/4 = 27 hours
The side length of a cube would be the cube root of its volume, because it's length, width and height are all the same. So the answer is 13
Answer:
y = 6/5x - 2 (or y = 1.2x - 2)
Step-by-step explanation:
To find the slope-intercept form ( = mx + b) you need to rearrange the equation of the line:
Step 1 - Add 18x to both sides
15y = 18x - 30
Step 2 - Divide both sides by 15.
y = 6/5x - 2