Answer:
It will take Machine A 20 additional minutes.
Step-by-step explanation:
First we have get the rate of work per hour, Machine A builds 1/2 of a car per hour, while Machine B builds 1/3 of a car per hour.
Using this we can determine the amount of work that has been done so far in one hour before Machine B broke down:
1/2 + 1/3 = 3/6 + 2/6 = 5/6
Now we can produce an equation accordingly to determine how much time it'll take machine a to finish the job:
5/6 + 1/2x = 1
1/2x = 1/6
x = 1/3 hours = 20 minutes
Note: In the question you typed "how much additional time will it take machine b to finish" but I think you meant machine a because machine b broke down. Please correct me if I'm wrong.
Hope this helps! And let me know if you have any questions!
Take 3.27 and divide that by 1.09 (for the oranges)
3.27/1.09=3lbs. of oranges
then take 4.76 and divide that by 1.19 (for the pears)
4.76/1.19=4lbs. of pears
add 4+3 to get how many lbs. in all
4+3=7
Answer: 504. Multiple for : 18, 24 and 42. Factorize of the above numbers : 18 = 2 • 32 24 = 23 • 3. 42 = 2 • 3 • 7
X=7/2 which is equal to 3.5