3/4=0.75
Since 3/4 (of the bar) + 1/4 (of the bar) equals a whole bar (1), and 3/4 (of the bar) + 0.75 equals the whole weight of the bar, 0.75 is 1/4 of the bar. 1/4 times 4 equals 1, and 0.75 times 4 equals 3, so the bar of soap weighs 3 pounds.
Answer:
green. You watched a friend play roulette for two hours. In that time you noted that the wheel was spun 50 times and that out of those 50 spins black came up 22 times. Based on this data, the This is an exgreen. You watched a friend play roulette for two hours. In that time you noted that the wheel was spun 50 times and that out of those 50 spins black came up 22 times. Based on this data, the This is an ex
Step-by-step explanation:
green. You watched a friend play roulette for two hours. In that time you noted that the wheel was spun 50 times and that out of those 50 spins black came up 22 times. Based on this data, the This is an ex
The slope of the perpendicular line will be 2. Remember, a perpendicular slope is the negative reciprocal.
So, we can make the equation
. We need to find b, and put b in.
To find b, put in the numbers of y and x.

Solve for b:

Now replace b in the original equation with 12 and that will be the answer:
The answer is
.
Answer:
4
Step-by-step explanation: 3 x 4 = 12.
12 - 8 = 4.
Answer:
<em>Most likely time, </em>according to PERT (Program evaluation and review technique).
Step-by-step explanation:
PERT is "a statistical tool used in <em>project management" (Program evaluation and review technique (2020), </em>in Wikipedia), and it is commonly used with CPM <em>(Critical Path Method)</em> to manage projects.
Inside PERT, there are different defined times to accomplished an activity in a project, that is:
- An <em>optimistic time</em> or minimum time required to accomplished an activity, i.e., if everything goes better than normal, the activity is accomplished before expected.
- A <em>pessimistic time, </em>a time quite the opposite to optimistic time.
- A <em>most likely time</em>, or a time required to accomplished an activity if everything goes as expected or normally.
- An <em>expected time</em>, an statistical estimation.
Considering the question, we have that the <em>time</em> when "the first module of the project could be completed":
- "[...] in as few as 15 days" is the <em>optimistic time</em>.
- "[...] or could take as many as 25 days" is the <em>pessimistic time</em>.
- "[...] but most likely will require 20 days" is the <em>most likely time</em>.
As a result, the <em>20-day estimate</em> is called the <em>most likely time</em> in the context of the PERT/CPM techniques.