Answer:
Electrons.
Explanation:
Electricity was discovered before the discovery of electrons by J.J Thompson in 1896. Before the electron, it was thought that it is the positive ions that move through the wire and carry current—that's why today the conventional current represents the flow of positive charges.
After J.J Thompson's discovery of the electrons, it was realized that it is the electrons that actually carry the current through the conductor. But changing the direction of the conventional current didn't seem appropriate, and that's why the convention continues to be used to this day—reminding us that once it were the positive ions that were thought to carry the current.
Change in position (triangleV) divided by change in time (triangleT)
Answer:
Explanation:
General Equation of SHM is given by
where x=position of particle
A=maximum Amplitude
angular frequency
t=time
At any time Total Energy is the sum of kinetic Energy and Elastic potential Energy i.e.
where k=spring constant
Potential Energy is given by
also it is given that Potential Energy(U) is equal to Kinetic Energy(K)
Total Energy
Total
at
velocity is
Given the value of the mass of each boxes, the work done in lifting the boxes to the given height is 1.6 × 10⁵J.
<h3>
Work done</h3>
Work done is simply defined as the energy transfer that takes place when an object is either pushed or pulled over a certain distance by an external force. It is expressed as;
W = F × d
Where F is force applied or Weight and d is distance
Also Force = Weight = mass × acceleration due to gravity.
Since gravity is acting on the boxes as it been lift
W = Weight × height from ground level
W = mg × d
Where m is mass of the boxes, g is accelration due to gravity( g = 9.8m/s² ) and d is distance from ground level.
Given the data in the question;
- Since each box has a mass of 7.89 kg
- Mass of the 345 boxes = 345 × 7.89 kg = 2722.05kg
- Distance or height d = 6.0m
To determine the work done, we substitute our values into the expression above.
W = mg × d
W = 2722.05kg × 9.8m/s² × 6.0m
W = 160056.5kgm²/s²
W = 160056.5J
W = 1.6 × 10⁵J
Therefore, Given the value of the mass of each boxes, the work done in lifting the boxes to the given height is 1.6 × 10⁵J.
Learn more about work done here: brainly.com/question/26115962