Answer:
Distance between them increase
Explanation:
The position S of the water droplet can be determined using equation of motion
where is the initial velocity which is zero here
is time taken, is acceleration due to gravity
the position of first drop after time is given by
the position of next drop at same time is
distance between them is is
from the above the difference will increase with the time
Answer:
Explanation:
Length = 1.00 m
If the length is 1.0, the vertical distance pivot to bob is cos 35 = 0.819
At the lowest point, vertical distance is 1.0, so the change is the difference, 0.181 meter
The potential energy of that height is converted to kinetic energy of motion, which determines the speed.
PE = KE
mgh = ½mV²
V = √(2gh) = 1.88 m/s
The work done on the filled bucket in raising out of the hole is 2, 925 Joules
<h3>How to determine the work done</h3>
Using the formula:
Work done = force * distance
Note that force = mass * acceleration
F = mg + ma
F = 4. 5 * 10 + 28 * 10
F = 45 + 280
F = 325 Newton
Distance = 9m
Substitute into formula
Work done = 325 * 9
Work done = 2, 925 Joules
Therefore, the work done is 2, 925 Joules
Learn more about work done here:
brainly.com/question/25573309
#SPJ1
For each load, Work = (mass) x (gravity) x (distance .
Bigger load: Work = (10 kg) x (9.8 m/s²) x (2 m) = 196 joules .
Smaller load: Work = (5 kg) x (9.8 m/s²) x (4 m) = 196 joules.
The work required is equal in both cases.
The mass ratio of 2:1 is exactly balanced by
the height ratio of 1:2 .