Answer:
therefore m=-3•5
Step-by-step explanation:
-39=18+4m
collect like terms
4m=18-39
4m=-14
divide both sides by 4m
m= -3•5
Answer:
drop down 1: P(A|B)
drop down 2: does not affect
drop down 3:P(A|B)=(A)
Step-by-step explanation:
tn=-3n+10
Substitute 8th term for n into the equation.
tn=-3(8)+10
Multiply the bracket first
=-24+10
tn=-14
Answer: b
I think this is the right answer.
Answer:
0.8029 = 80.29% probability that the thickness is between 3.0 and 7.0 mm.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Mean of 4.6 millimeters (mm) and a standard deviation of 1.5 mm.
This means that 
Find the probability that the thickness is between 3.0 and 7.0 mm.
This is the pvalue of Z when X = 7 subtracted by the pvalue of Z when X = 3. So
X = 7



has a pvalue of 0.9452
X = 3



has a pvalue of 0.1423
0.9452 - 0.1423 = 0.8029
0.8029 = 80.29% probability that the thickness is between 3.0 and 7.0 mm.
Answer
algebraic equation
Step-by-step explanation: