Since you didn't give the original picture, I can only explain the process. Then, you need to select the correct point.
In a dilation, we multiply the coordinates by the scale factor. Take the points that you have and multiply them all by 4. Then, look for a point making your new coordinates.
Answer:
B. g(x)= |x| + 5
Step-by-step explanation:
-5 represents a vertical shift down, so that narrows it down to either A or B. A shows a shift across the horizontal (X) axis, so it must be B.
Answer:
1.42 hours
Step-by-step explanation:
In this case we must take into account that the speed would be to fill a pool for a time, that this case is in hours, therefore it would be like this:
1/5 for the first pipe
1/2 for the second pipe
Now, we will use both at the same time, therefore:
1/5 + 1/2 = 1 / x
0.7 = 1 / x
x = 1 / 0.7
x = 1.42
That is to say that if we use both we will take a total of 1.42 hours
Answer:
49 minutes
Step-by-step explanation:
9:50 to 10:00 is 10 minutes
plus the 39 minutes in 10:39
10 + 39 = 49
hope i helped
Im not sure but I would think you would divide 75 by .15. That would get you 500. So 500 minutes would be your answer.