Answer:
0, because the house is already painted. If this isn't a riddle then, it should take 4 days because that is half the people, two times the workload per person.
I think associative, because it is the same thing in a different order.
4a5+28+6b7-30
4a5+6b7-2<—- this is a to the power of 5 , b to the power of 7
(Is that 5a or a to the power of 5 )
20a+28+42b-30
20a+42b-2<—— this is 5a , 7b
Answer:
(3, 2), (6, 4)
Step-by-step explanation:
Since one end (A) of the segment AB is at the origin, the required points will be 1/3 and 2/3 of the coordinates of B:
(1/3)(9, 6) = (3, 2)
(2/3)(9, 6) = (6, 4)
The answer is C because it is at the first of four intervals between 0 and 1