So,
720 pt./hr.
2 pt. = 1 qt.
720/2 = 360
360 qt./hr.
Now, since there are 60 mins. in 1 hr., multiply the number by 60.
360(60) = 21600
720 pt./hr. = 21,600 qt./min.
To solve the inequality, you need to isolate/get x by itself:
171 > -6x Divide -6 on both sides [dividing/multiplying a negative number on
-28.5 < x [dividing/multiplying a negative number in an inequality causes the sign (<, >, ≤, ≥) to flip]
-28.5 < x [x is a number greater than -28.5]
So your graph should have an open circle at -28.5 (the first small line next to -28), and the arrow pointing to the right since x is greater than -28.5 (increasing) The 1st option is your answer
[use the o---> and put it at -28.5]
You have to set it up as two problems then combined like terms then add them together
9x2-1............................................................................
Your answer would be 13,122
You would multiply by -3 each time for this particular sequence.
Hope I helped!