IrinaVladis [17]
2 years ago
13

Which business structure is subject to the most government rules and regulations?

Engineering
1 answer:
Lesechka [4]2 years ago
8 0

Answer: Corporation

You might be interested in
Hi I don't know of yall remeber me, but I'm Jadin aka J. I am looking for my friend group, that I have missed but can't find cau
kirill [66]

Answer:

The young lady was his daughter.The shoemaker was frightened when he saw that she wants to sit near him and took his knife to frighten her and leave him alone to do his work

Explanation:

could uh name them since if i know any i would surely tryin help

7 0
2 years ago
What are the main differences between pipefitters and plumbers? (Select all that apply.)
romanna [79]

Answer:

pipefitters design systems whereas plumbers maintain systems

8 0
2 years ago
What Advantage does a voltmeter have over a noncontact voltage indicator when testing for voltage
galina1969 [7]

Answer:

Obviously you shouldn't rely just on the meter for your safety. You'd disconnect wall fuses or kill main switches before you start, using the meter just gives you some extra protection: with the meter you might notice for example that you've disconnected the wrong fuse and the unit is still live.

Explanation:

Hope it helps! :)

5 0
2 years ago
Individual/organizations who are responsible for monitoring, verifying, and sometimes certifying various aspects of the construc
Rus_ich [418]

The project or the site manager is responsible for monitoring or verifying the aspects of the construction process.

The site or the project manager is the individual that is responsible for the adherence to quality and guidance on the construction site.

The site or project manager has the following tasks

  • ensuring safety on the site
  • Monitoring the progress or the work that is being done
  • Sourcing materials
  • Solving problems

In conclusion, the project manager monitors and verifies aspects of the construction process.

Read more on brainly.com/question/24887827?referrer=searchResults

8 0
2 years ago
1. In an assembly two flanges are held together by a 1/2"" bolt that is threaded into one of the flanges. (a) If the clearance h
creativ13 [48]

Answer:

The solution and complete explanation for the above question and mentioned conditions is given below in the attached document.i hope my explanation will help you in understanding this particular question.

Explanation:

5 0
3 years ago
Other questions:
  • Teresa is emotionally volatile, particularly with friends and boyfriends. She is extremely dramatic about even the smallest disa
    15·1 answer
  • Read two numbers from user input. Then, print the sum of those numbers. Hint -- Copy/paste the following code, then just type co
    14·1 answer
  • A combinational switching circuit has four inputs (A, B, C, D) and one output (F).
    9·1 answer
  • WHAT IS THE EFFECT OF ICE ACCRETION ON THE LONGITUDINAL STABILITY OF AN AIRCRAFT?
    8·1 answer
  • Whatever they said bbbbbbbbbbbbbbbbbb
    6·2 answers
  • 6.
    8·1 answer
  • Why are there few effective HCI standards?
    6·1 answer
  • 4. The instant the ignition switch is turned to the start position,
    13·1 answer
  • A gas turbine receives a mixture having the following molar analysis: 10% CO2, 19% H2O, 71% N2 at 720 K, 0.35 MPa and a volumetr
    5·1 answer
  • The A/C compressor will not engage when the A/C is turned on. The static refrigerant pressure is 75 psi and the outside temperat
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!