1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Natasha2012 [34]
3 years ago
9

Two employees were installing aluminum siding on a farmhouse when it became necessary to remove a 36-foot high metal pole CB ant

enna. One employee stood on a metal pick board between two ladders and unfastened the antenna at the top of the house. The other employee, who was standing on the ground, took the antenna to lay it down in the yard. The antenna made electrical contact with a 7200-volt power transmission line 30 feet 10 inches from the house and 23 feet 9 inches above the ground. The employee handling the antenna received a fatal shock and the other employee a minor shock. What precautions might have prevented this accident
Engineering
1 answer:
Evgesh-ka [11]3 years ago
7 0

Answer:using rubber gloves and choping the antena in 2

Explanation:

You might be interested in
Oliver is designing a new children’s slide to increase the speed at which a child can descend. His first design involved steel b
AVprozaik [17]

Answer:

The correct option is;

A) Steel becomes too hot in the Sun and can burn the children

Explanation:

The properties of steel includes;

Low specific heat capacity, high thermal and electrical toughness, high hardness, high tensile strength, high yield strength, appreciable elongation, high fatigue strength, can easily corrode, high malleability and ability to creep

Therefore, due to the low specific heat capacity, which is 0.511 J/(g·°C) and high conductivity of steel which is about 32 W/(m·k), the temperature of the steel can rapidly rise and the hot steel surface can readily conduct the heat, (due to the temperature difference) to other bodies that come in contact

8 0
3 years ago
2. (Problem 4.60 on main book, diameters different) Water flows steadily through a fire hose and nozzle. The hose is 35 mm diame
Viefleur [7K]

Answer:

coupling is in tension

Force = -244.81 N

Explanation:

Diameter of Hose ( D1 ) = 35 mm

Diameter of nozzle ( D2 ) = 25 mm

water gage pressure in hose = 510 kPa

stream leaving the nozzle is uniform

exit speed and pressure = 32 m/s and atmospheric

<u>Determine the force transmitted by the coupling between the nozzle and hose </u>

attached below is the remaining part of the  detailed solution

Inlet velocity ( V1 ) = V2 ( D2/D1 )^2  

= 32 ( 25 / 35 )^2

= 16.33 m/s

4 0
3 years ago
If you were driving the blue Prius in the situation pictured above, explain why the red Mustang should be given right-of-way at
dexar [7]

Answer:

The blue Prius, because the Mustang arrived almost in the same time. And when you arrive in an intersection at the same time of other vehicle you need yield for the car on your right if the car is on your left you have the right of way.

Explanation:

4 0
3 years ago
An airline ticket counter forecasts that 220 people per hour will need to check in. It takes an average of 2 minutes to service
Nadusha1986 [10]

A) Number of agents required to achieve a wait time of 10 minutes or less = 8 agents

B) The number of agents required on duty to reduce cost = 9 agents

<u>Given data : </u>

Arrival rate of customers ( β ) = 220 per hour

Service rate ( mu ) = 60 minutes / 2 minutes = 30 customer per hour

utilization ( rho ) = 220 / 30 ≈ 7

at least 8 server personnel are required for stability of the queue

A<u>) Determine the number of agents required to achieve a wait time of 10 minutes or less per customer</u>

waiting time = 10 - 2 = 8 minutes

number of customers waiting ( ∝ ) = 7 and required server = 8

assuming   Lq = 5.2266

Hence the waiting time in line = Lq / arrival rate

                                                  = 5.2266 / 220 = 0.0238 hour

                                                  = 0.0238 * 60 = 1.428 minutes

Since the waiting time ( 1.428 minutes ) is less than the original waiting time ( 2 minutes ) the number of agents that will achieve a wait time of 10 minutes or less is = 8 agents

<u>B) Determine the number of</u><u> ticket agents</u><u> that should be on duty to minimize cost </u>

salary of ticket agent = £12 per hour

cost of customer waiting in queue = £5 per hour per customer

<em> </em><u>i) When 8 agents are used </u>

waiting time of customers = 0.0238 * 220 = 5.236

waiting cost for customers = 5.236 * 5 = £26.18

employee cost = 8 * 12 = £96

∴ Total cost = 96 + 26.18

                    = £ 122.18

<u>ii) When 9 agents are used </u>

waiting time for customers = 0.0074 * 220 = 1.628

Wq = 1.6367 / 220 = 0.0074

waiting cost for customers = 1.6367 * 5 = £ 8.1835

assuming Lq = 1.6367

employee cost = 9 * 12 = £ 108

∴ Total cost = 108 + 8.1835 = £ 116.18

From the calculations in ( i ) and ( ii ) the Ideal number of ticket agents that should be on duty to minimize cost should be 9 agents.

Hence we can conclude that A) Number of agents required to achieve a wait time of 10 minutes or less = 8 agents and The number of agents required on duty to reduce cost = 9 agents.

Learn more about cost reduction : brainly.com/question/14115944

6 0
3 years ago
18) Technician A says that adjustable wrenches should be used when
kykrilka [37]
Tryna boost my score for college stuff could you give me the brainiest and a thanks? Hope you find your answer your looking for!
4 0
3 years ago
Other questions:
  • I need answers for this sheet please.
    15·1 answer
  • An inventor tries to sell you his new heat engine that takes in 40 J of heat at 87°C on each cycle, expels 30 J at 27°C, and doe
    14·1 answer
  • Burn in hell i watched your stupid video and i still could not get the answer
    14·1 answer
  • Opposition to current flow, restricts or resists current flow
    15·1 answer
  • An object at a vertical elevation of 20 m and a speed of 5 m/s decreases in elevation to an elevation of 1 m. At this location,
    15·1 answer
  • Whats is the purpose of the stator winding​
    13·1 answer
  • There are three different types of slings. What determines which type you use?
    13·1 answer
  • What subject is he......... now? Vietnamese.A. to learnB. learnC. learningD. learned
    10·1 answer
  • 4.6. What is the maximum peak output voltage and current if the supply voltages are changed to +15 V and -15 V.​
    6·1 answer
  • This test should be performed on all cord sets, receptacles that aren't part of a building or structure's permanent wiring, and
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!