Answer:
4 students
Step-by-step explanation:
The total number of students is given by:

Where N is the total number of students, A is the number of students that have taken Math 2A, B is the number of students that have taken Math 2B, and C is the number of students that have taken Math 2C:

4 students in Group A have taken all three classes.
*The number of students that have taken two classes has be subtracted so those students do not get counted twice
Answer:
8
Step-by-step explanation:
Answer:
So to maximize profit 24 downhill and 20 cross country shouldbe produced
Step-by-step explanation:
Let X be the number of downhill skis and Y the number of cross country skis.
Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours
Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.
Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90
total finishing time taken = 0.5x+1.5 y≤42
Profit function
Z = 50x+50y
Objective is to maximize Z
Solving the two equations we get intersecting point is
(x,y) = (24,20)
In the feasible region corner points are (0.28) (36,0)
Profit for these points are
i) 2200 for (24,20)
ii) 1400 for (0,28)
iii) 1800 for (36,0)
So to maximize profit 24 downhill and 20 cross country shouldbe produced.
Answer:
You just have to divide the equation by "x"'s coefficient (2).
2x/2=x
66/2=33
x=33
Step-by-step explanation: