Answer:
Magnetic energy and electromagnetic energy form of potential energy followed by a form of kinetic energy.
(B) is correct option.
Explanation:
Given that,
Lists a form of potential energy followed by a form of kinetic energy
We know that,
Sound energy :
The movement of energy through object it is called sound energy. When a object produced vibration by force then it moves in wave.
Sound wave is example of kinetic energy.
Nuclear energy :
The store energy in the nucleus of the atom it is called nuclear energy. This energy released when occurs fusion and fission.
Nuclear energy is the example of potential energy
Magnetic energy :
Magnetic energy is a type of potential energy which is depend on distance and position in the magnetic field.
Electromagnetic energy :
Electromagnetic energy is light energy. it is type of kinetic energy.
Gravitational energy :
Gravitational energy is a type of potential energy. It is an energy related with gravity or gravitational force.
Elastic energy :
The store energy in elastic object it is called elastic energy. This energy is a type of potential energy.
Electrical energy :
The movement of electrons is called electrical energy. When electrons move through a wire then it is are called electricity. Electrical energy is type of kinetic energy.
Hence, Magnetic energy and electromagnetic energy form of potential energy followed by a form of kinetic energy.
(B) is correct option.
Answer: <em>4</em><em>2</em><em>.</em><em>3</em><em>2</em><em> </em><em>ms-1</em>
Explanation:
v = u+ at
v = 24.4 + ( 3.2×5.6)
v = 42.32 ms-1
Answer = 31.5J (rounded to 1dp)
The question wants to find the work done, where work done can be calculated in the equation:
Work done = Force x Distance
The force is not given in the question, however they give the acceleration and mass, so you can calculate the force using Newton's second law:
Force = Mass x Acceleration
First, calculate the force. The mass is 45kg for the 3 boxes and the acceleration is 12.3m/s^2.
Force = 45 x 12.3
Force = 553.5N
Now that you have the force (553.5N) and distance (57cm), substitute those values into the equation for work done.
Make sure to convert the 57cm into metres (into SI units), otherwise the answer would be wrong.
57cm = 0.057m
Work done = Force x Distance
Work done = 553.5 x 0.057
Work done = 31.5J (rounded to 1dp)
let the plane is flying at some angle theta with west towards north
Now we can use the components


now since plane has to fly towards west so net speed in north must be equal to speed in south for air
So we can say



so plane has to fly in direction 14.5 degree North of west