Answer:
<h2>E. 3.95kW</h2>
Explanation:
Power is defined as the rate of workdone.
Power = Workdone/time taken
Given Workdone = Force * distance
Power = Force * distance/time taken
Power = mgd/t (F = mg)
m = mass of the sand in kg
g = acceleration due to gravity in m/s²
d = vertical distance covered in metres
t = time taken in seconds
Given m = 2000kg, d = 12m, t = 1min = 60secs, g = 9.8m/s²
Power = 2000*9.8*12/60
Power = 3920Watts
Minimum rate of power that must be supplied to this machine is 3920Watts or 3.92kW
Answer:
time required is 6.72 years
Explanation:
Given data
mass m = 3.20 ✕ 10^7 kg
height h = 2.00 km = 2 × 10^3 m
power p = 2.96 kW =2.96 × 10^3 J/s
to find out
time period
solution
we know work is mass × gravity force × height
and power is work / time
so we say that power = mass gravity force × height / time
now put all value and find time period
power = mass × gravity force × height / time
2.96 × 10^3 = 3.20 ✕ 10^7 × 9.81× 2 × 10^3 / time
time = 62.784 × 10^10 / 2.96 × 10^3
time = 21.21081081 × 10^7 sec
time = 58.91891892 × 10^3 hours
time = 6.72 years
so time required is 6.72 years
Answer:
Explanation:
The work done is defined as the product of force applied in the direction of displacement and the displacement.
W = F x d x Cosθ
where, F is the force applied, d be the displacement and θ be the angle between the displacement and force.
For the normal forces, the angle between the displacement and the force applied is 90 degree, and the value of Cos 90 is zero, so the work done is zero.
Answer:
The height at wich the object floats
Explain
took on edge 2020