Answer:
C. [Sorry if it's wrong.]
Step-by-step explanation:
I haven't taken this test but when looking at the photo, it looked like they intercepted at (0, 2).
Answer:
Zero-elevation surface is a vertical datum that is used to describe a surface, such as that of a planet. The value of this datum is usually adopted by statute. This elevation is used, for example, to build a texture map from an agreed surface, such as a spheroid with dimensions defined by a mean surface gravity.
Step-by-step explanation:
Answer: C=xm+b
Expression variables used and meaning;
C=total cost of purchase
x=number of baseballs
m=cost of baseball
b=cost of other equipment bought
Any questions at all please feel free to ask. Thank you!
Answer:
C = $35,740
Step-by-step explanation:
To calculated the expected cost to the company of a batch of 500 chairs, we need to find the expected number of defective chairs on a batch of 500 chairs, it is calculated as:
D = 500*(0.4*0.01*+ 0.35*0.02* + 0.25*0.03)
D = 9.25 defective chairs
Because we have 500 chairs, a probability of 0.4 to have 1% defective chairs, a probability of 0.35 to have 2% defective chairs and a probability of 0.25 to have 3% defective chairs.
Now, we just need to calculated the expected cost as:
C = 500*($70) + 9.25*($70+$10)
C = $35,740
Because we have 500 chairs that cost $70 each and 9.25 defective chairs that need to be replaced with a cost of $70 plus $10.
So, the expected cost to the company of a batch of 500 chairs is equal to $35,740
Answer:
Intergers
Step-by-step explanation:
A subset is a part of a whole math concept, idea, or sample space.
We need to find what math concept -5 is apart of.
-5 is part of the All Real Numbers section.
-5 is also part of integers as well.