1) Under which Condition can a soil be chemically Stabilize.
Answer
a). Plasticity Index :A soil with a high value of plasticity Index is not good for various engineering projects. The introduction of line helps in reducing plasticity due cation exchange reaction.Pozzolanic reaction over time reduces plasticity and increase index strength due to the formation of calcium - silicate hydrate.
Answer: you can watch a video on how to solve this question on you tube
Answer:
a. The very first liquid process, when heated from 1250 degree Celsius, is expected to form at the temperature by which the vertical line crosses the phase boundary (a -(a + L)) which is about <em>1310 degree Celsius. </em>
b. The structure of that first liquid is identified by the intersection with ((a+ L)-L) phase boundary; <em>47wt %of Ni</em> is of a tie line formed across the (a+ L) phase area <em>at 1310 degrees.</em>
c. To find the alloy's full melting, it is determined that the intersection of the same vertical line at 60 wt percent Ni with (a -(a+L)) phase boundary is around <em>1350 degrees.</em>
c. The structure of the last remaining solid before full melting correlates to the intersection with the phase boundary (a -(a + L), of the tie line built at 1350 degrees across the (a + L) phase area, <em>being 72wt % of Ni.</em>
Answer:
2.0%
Explanation:
Percentage of aggregate = 94%
Specific gravity = 2.65
Specific gravity of asphalt = 1.9
Density of mix = 147pcf = 147lb/ft³
Total weight of mix: (volume = 1ft³)
= (147lb/ft³)(1ft³)
= 147lb
Percentage weight of asphalt in<u> mix:</u>
100% - 94%
= 6%
Weight of asphalt binders
= 6% x 147lb
= 8.82lb
Weight of aggregate in mix:
= 94% x 147
= 138.18lb
Specific weight of asphalt binder:
(Gab)(Yw)
Yw = specific Weight of water
= 62.4lb
Gab = specific gravity of asphalt binder
= 1.0
(62.4lb)(1.0)
= 62.4 lb/ft³
Volume of asphalt in binder:
8.82/62.4
= 0.14ft³
Specific weight of binder in mix:
2.65 x 62.4lb/ft³
= 165.36 lb/ft³
Volume of aggregate:
= 138.18/165.36
= 0.84ft³
Volume of void in the mix:
1ft³ - 0.84ft³ - 0.14ft³
= 0.02ft³
<u>The percentage of void in total mix:</u>
VTM = (0.02ft³/1ft³)100