Answer:
5984.67N
Explanation:
A 14 inch diameter pipe is decreased in diameter by 2 inches through a contraction. The pressure entering the contraction is 28 psi and a pressure drop of 2 psi occurs through the contraction if the upstream velocity is 4.0 ft/sec. What is the magnitude of the resultant force (lbs) needed to hold the pipe in place?
from continuity equation
v1A1=v2A2
equation of continuity
v1=4ft /s=1.21m/s
d1=14 inch=.35m
d2=14-2=0.304m
A1=pi*d^2/4
0.096m^2
a2=0.0706m^2
from continuity once again
1.21*0.096=v2(0.07)
v2=1.65
force on the pipe
(p1A1- p2A2) + m(v2 – v1)
from bernoulli
p1 + ρv1^2/2 = p2 + ρv2^2/2
difference in pressure or pressure drop
p1-p2=2psi
13.789N/m^2=rho(1.65^2-1.21^2)/2
rho=21.91kg/m^3
since the pipe is cylindrical
pressure is egh
13.789=21.91*9.81*h
length of the pipe is
0.064m
AH=volume of the pipe(area *h)
the mass =rho*A*H
0.064*0.07*21.91
m=0.098kg
(193053*0.096- 179263.6* 0.07) + 0.098(1.65 – 1.21)
force =5984.67N
Answer:
ok I will help you ha Ha ha ha ha ha ha ha ha ha ha ha
Explanation:
Clearance:
For easy matching and dis matching of hole and shaft we use size of hole little bit more than the size of shaft and this difference in size is called clearance.
Backlash:
It is the clearance between the two mating gear to avoids failure of gears.Actually when temperature of gears increases then at the same time the size of gear also increases ,due this there is a possibility foe jamming of gears so to avoids this backlash is provides.
Interference:
When two gears are matting then addendum of one gear inters into the deddendum of another gear and due to this gears get jam .This phenomenon is called interference.
Answer:
Reflection
Explanation:
The specific behavior of light that will be essential to ensure the success of your design is "Reflection". This is because light maze makes use of a mirror and it's the light that is reflected that we see with our eyes. Also, the manner in which light is reflected off objects will affect the colors that are reflected as well.
Answer:
26.7 min
Explanation:
First, we will find the <u>time required to drill each hole</u>:
- N = 300 x 12/0.75
= 1527.7 rev/min
- fr = 1527.7 (0.015) = 22.916 in/min
Formula for <u>distance per hole</u>: 0.5 + A + 1.75
- A = 0.5 (0.75) tan (90-100 / 2) = 0.315 in
- Tm = (0.5 + 0.315 + 1.75) / 22.916 = 0.112 min
Now, we will calculate the <u>time required to draw back the drill form hole</u>:
= 0.112 / 2 = 0.056 min
Time to move between holes = 1.5 / 15 = 0.1 min
For 100 holes, the number of moves between holes = 99
Total time required to drill 100 holes (t):
t = 100 (0.112 + 0.056) + 99 (0.1) = 26.7 min