Answer:
The work done on the system can be accounted for by;
Both
and 
Explanation:
The speed of the crate = Constant
Therefore, the acceleration of the crate = 0 m/s²
The net force applied to the crate,
= 0
Therefore, the force of with which the crate is pulled = The force resisting the upward motion of the crate
However, we have;
The force resisting the upward motion of the crate = The weight of the crate + The frictional resistance of the ramp due to the surface contact between the ramp and the crate
The work done on the system = The energy to balance the resisting force = The weight of the crate × The height the crate is raised + The heat generated as internal energy to the system
The weight of the crate × The height the crate is raised = Gravitational Potential Energy = 
The heat generated as internal energy to the system = 
Therefore;
The work done on the system =
+
.
when an object is revolving in circular path then its velocity is always along the tangent of the circular path
so while moving in circular path if the string is break then due to law of inertia the object will always move in the direction of initial motion
As we know that as per law of inertia if an object will not change its state of motion or state of rest until some external force will act on it.
So here also the object will move along its tangential direction once the string will break
so here the correct path will be
Option B
The correct answer from the choices listed above is the first option. The statement that is true would be that c<span>ompound AB has chemical and physical properties that are completely different from those of A and B. They completely different substances with different properties.</span>
4days and 12hours
Explanation:
Given parameters:
Average speed = 15m/s
Distance = 1800 miles
Unknown:
Number of days = ?
Solution:
Speed is the rate of change of distance with time;
Speed = 
Since the unknown is number of days, it is a measure of time:
Time = 
The distance from California to Lansing is 1800miles. The journey takes the truck drivers to and fro. It is a two way trip;
Total distance = 1800 miles x 2 = 3600miles
We need to convert miles to meters since that is the unit we can conveniently work with;
1 mile = 1609.34m
3600 miles = 3600 x 1609.34
= 5793638m
Inputting the values in the equation:
Time =
= 386242.53s
Now we need to convert to day;
In a day, = 60 x 60 x 24 = 86,400s
1 day = 86400s
Therefore;
The number of days =
= 4.47days
This implies that it will take them 4 days and approximately 12 hours.
learn more:
speed brainly.com/question/10048445
#learnwithBrainly
momentum = mass * velocity
62.5 = mass * 3.6
mass = 62.5/3.6
mass = 17.36 kg