Answer:
Magnitude of vector A = 0.904
Explanation:
Vector A , which is directed along an x axis, that is

Vector B , which has a magnitude of 5.5 m


The sum is a third vector that is directed along the y axis, with a magnitude that is 6.0 times that of vector A 
Comparing we will get

Substituting in 

So we have

Magnitude of vector A = 0.904
Answer: if the mass is doubled, the force of gravity is doubled, meaning it decreases. If the distance is doubled, the force of gravity is 1/4 as strong as before
Explanation:
Answer:
The time taken by the brick to hit the ground, t = 0.84 s
Explanation:
Given that,
A brick falls from a height, h = 3.42 m
The initial velocity of the brick is zero.
Since the brick is under free-falling. The time equation of a free-falling body when the displacement is given is
t = 
where,
h - height from surface in meters
g - acceleration due to gravity
on substituting the values in the above equation,
t = 
= 0.84 s
Hence, time taken by the brick to hit the ground is t = 0.84 s
A pebbled, uneven road would be easier to see at night because it minimizes the reflection of light from car’s light coming in the opposite direction. It is difficult to see when driving on the rainy day because the roadway reflects light from cars coming in the opposite <span>directions.</span>
Answer:
Yes
Explanation:
Yes, this is a random error generating because of statistical constraint. We only have finite number of data points. As per this, if we plot our observation we will get a gaussian (inverse bell ) shaped curve with mean equal to central value.