Answer:
Bottom-up Estimation
Explanation:
Bottom-up estimation is a type of project cost estimation that considers the cost of individual project activities and finally sums them up or finds the aggregates. The summation gives an idea of what the entire project will cost.
This is an effective way of estimating the cost of a project as it evaluates the costs on a wholistic basis. It also considers the tiniest details during the estimation process. The process moves from the simpler details to the more complicated details.
Ans: A quality handsaw makes jobs such as crosscutting moldings, cleaning out dovetails and flush cutting dowels and pegs faster, cleaner and safer. There are myriad different types and sizes of blades for working with wood and other materials.
Answer:
The detailed explanation of answer is given in attached file.
Explanation:
Answer:give the cart another shape
Explanation:an aeroplane shape makes it fast,,in physical science,the streamlined body makes a body fast
Answer:
<h2>Generator </h2>
Explanation:
A generator converts mechanical energy into electrical energy