Answer:
Mass of cement used is 62.5 lb
Mass of gravel used is 225 lb
Explanation:
The ratio given here is cement to sand to gravel = 1 : 2.4 : 3.6
So, for 150 lb of sand
C : S : G = 1 : 2.4 : 3.6

Mass of cement used is 62.5 lb

Mass of gravel used is 225 lb
Answer:
The minimum particle diameter that is removed at 85% is 1.474 * 10 ^⁻4 meters.
Solution
Given:
Length = 48 m
Width = 12 m
Depth = 3m
Flow rate = 4 m 3 /s
Water density = 10 3 kg/m 3
Dynamic viscosity = 1.30710 -3 N.sec/m
Now,
At the minimum particular diameter it is stated as follows:
The Reynolds number= 0.1
Thus,
0.1 =ρVTD/μ
VT = Dp² ( ρp- ρ) g/ 10μ²
Where
gn = The case/issue of sedimentation
VT = Terminal velocity
So,
0.1 = Dp³ ( ρp- ρ) g/ 10μ²
This becomes,
0.1 = 1000 * dp³ (1100-1000) g 0.1/ 10 *(1.307 * 10 ^⁻3)²
= 3.074 * 10 ^⁻6 = dp³ (.g01 * 10^6)
dp³=3.1343 * 10 ^⁻12
Dp minimum= 1.474 * 10 ^⁻4 meters.
I would help but don’t speak that sorry
Answer:
a) 294.34 days
b) Δh = 25.361 cm
Explanation:
Given data:
Thickness of clay layer = 18 ft
initial pressure = 0.75 ton/ft^2
final pressure = 1.5 ton/ft^2
Δp = 0.75 ton/ft^2
eo = 1.12
e1 = 0.98
k = 4.3 * 10^-7 cm/sec
A ) determine how long it will take to reach 70% consolidation
attached below is the detailed solution
T( time in days ) = 294.34 days
B) determine settlement at 70%
attached below is the detailed solution
Δh = 25.361 cm
Answer:
A
Hope this helps!
Explanation:
You need to find what the problem is and what can or can not be done to solve that issue/compete the task