Overall project duration
Explanation:
Scheduling can best be defined as the process used to determine a overall project duration.
Answer:
A. smallest wire is No. 12
The answer is answered! Explanation:
Answer:
<em>The direction of ball will be Number 4 (as can be seen in attached picture) ---- the path of ball will be making some angle when it leaves the tube. </em>
Explanation:
The question is incomplete. So the picture, which is missing in question, is attached for your review.
As it can be seen in the picture, the ball coming out of the tube will have two components of velocity. One is along the length of tube (because ball is moving in that direction and is coming out from the hole), other is velocity component will be perpendicular to the tube (because the ball is made to move in that direction as the tube is rolling on the surface).
<em>So, taking the resultant of two vectors of velocity, the resultant direction of ball will be Number 4 (as can be seen in attached picture) ---- the path of ball will be making some angle when it leaves the tube. </em>
Answer:
depends on the size
Explanation:
Length x width x depth x 7.5 = volume (in gallons)
Length times width gives the surface area of the pool. Multiplying that by the depth gives the volume in cubic feet. Since there are 7.5 gallons in each cubic foot, multiply the cubic feet of the pool by 7.5 to arrive at the volume of the pool, expressed in gallons.