Answer:
See Below
Step-by-step explanation:
1) 180 ft / 6 sec
To find a unit rate, you need to have a denominator of 1 and to to do that, you can divide the numerator and denominator by the same number, in this case: 6.
30 ft / 1 sec
2) 86 mi / 5 hr
Same as above^(except dividing by 5)
17.2 mi / 1 hr
3) 83 mi / 5 hr
Same as above^^
16.6 mi / 1 hr
We can rewrite this as: 16.6 mph
4) 93 mi / 5 hr
Same as above^^^
18.6 mi / 1 hr
5) 150 mi / 4 hr
Same as above^^^^
37.5 mi / 1 hr
We can rewrite this as: 37.5 mph
ANSWER:
0.25
i attached my work, hope this helps
Solve each system using a matrix
7x+2y=5
13x+14y=-1Solve each system using a matrix
7x+2y=5
13x+14y=-1
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
Answer:
D
Step-by-step explanation: