The answer is D
At first glance we can see the slope of the line is negative. Automatically A and C are incorrect. Slope is y/x, we go 1 space down and 5 spaces to the right. (Run over rise)
135 / 3 is 45 and 45 x 8 is 360 so she can type 360 words in 8 minutes.
Step-by-step explanation:
here ,
length = 8m
height=4m
Rate of plastering 4 walls = 15/m^2
Cost of plastering 4 wall = Rs 1560
Area of floor = Cost of plastering / Rate of plastering
= 1560/15
= 104
again,
Area of four wall = 2h(l+b)
or, 104= 2×4(8+b)
or, 104 =8(8+b)
or, 104/8=8+ b
or,13 - 8= b
or, b= 5
again,
Area of floor= l×b
= 8×5
= 40
again,
Rate of carpeting the floor= 300/ m^2
Area of floor = 40 m^2
cost of carpeting=Rate × Area
= 300×40
= 12000
Answer:
6
Step-by-step explanation:
Answer: All real numbers :)