1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
andreyandreev [35.5K]
3 years ago
14

10 tasks and 5 exercises. How many ways are there to build the test?

Engineering
1 answer:
Katyanochek1 [597]3 years ago
6 0

To find how many ways, you must simply multiply <u>10 tasks and 5 exercises</u>

<u></u>

    Ways: = 10 * 5 = 50 ways

Hope that helps!

<u></u>

<u></u>

You might be interested in
Given a program with execution times broken down shown below. Assume that techniques can only be applied to accelerate the integ
Alex17521 [72]

<u>Solution and Explanation:</u>

Floating point and Integer consumes 1000 seconds of 1600 seconds.

Since we shall be talking of theoretical speed-up, please do not try to relate this with any practical scenario :P

To achieve maximum speed up, we need to reduce the time consumed by FP and Integer as large as possible. So we consider a system that does not at all consume time to perform FP and Integer operations. With such specifications, we can say that our new system will consume 600 seconds.

 speed up = 1600 divide by 600 = 2.66

<u>part b: </u>

We need a System with enhancement that will result in speedup of 2.

So the time required for the new system would be 800 sec

 Required time = 1600 divide by = 800 seconds

It is now given that Floating Point can now be accelerated by 5 times, so our enhanced system will consume 40 seconds to perform Floating point operations

We know that Load/Store and branch operations cannot be enhanced and hence they will consume 600 seconds.

Therefore to attend speedup of 2, Integer operations must be completed in 160 seconds (160 = 800 – (600 + 40))

So speed up required for Integer Operations is 800/160 = 5

So Integer Operation should need 5 times less time to achieve speed up of 2

7 0
3 years ago
: A drive system using the electric motor is under load as 75Nm with an angular velocity of 100rad/s, then the electric motor is
ahrayia [7]

Answer:unsure about how long.

Explanation:

3 0
3 years ago
Which of the following is not true about manufacturing employment in the U.S?
MakcuM [25]

Explanation:

If I guessed, I'd say the answer is choice (a).

The change in skills required to perform new tasks in manufacturing, along with import competition and a decline in mobility, have contributed to the decline of employment rate for manufacturing since 2000

4 0
3 years ago
What do you understand by the term phase angle?<br>​
aleksandrvk [35]

Answer:

The angle between the earth and the sun as seen from a planet is called phase angle.

5 0
3 years ago
Plz help electrical technology
oksano4ka [1.4K]

Answer:

OPTION A,Larger

HOPE IT HELPS

8 0
3 years ago
Read 2 more answers
Other questions:
  • Laws that protect businesses involve
    10·1 answer
  • Its an opinion!!!!
    8·1 answer
  • IN JAVA,
    6·1 answer
  • You are traveling along an interstate highway at 32.0 m/s (about 72 mph) when a truck stops suddenly in front of you. You immedi
    11·1 answer
  • El tiempo hasta que falle un sistema informático sigue una distribución Exponencial con media de 600hs. (Utilice 3 decimales par
    13·1 answer
  • 4 points
    13·1 answer
  • What three training organizations are important for Union Masons?
    14·1 answer
  • How does the Ivanpah Solar Plant make electricity?
    12·1 answer
  • Porque el invento de la bombilla es importante?
    6·1 answer
  • fdkgdsvdgvdfgvsdcvbfbfdbvfdbsdvbesgvdslgfkrledmgoskflodjgloerjgvoljgegjp;erorf;wgp;kiaers;ogjo;rhgerjfrejgfdlhodjglodjheihtgo;rg
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!